Skip to main content

Schematic design for a segment of the 2/3-mile Big Four Trail in Lebanon, Indiana

Effort identified a schematic trail alignment, garnered stakeholder and public input and consensus for finalizing the trail vernacular

Trail planning and design needs included determining access points, parking, connections between trail and Lebanon destinations, right-of-way crossings, bikeways and incorporation of current signage and wayfinding

Considerations for subsequent and future trail segments

Design recommendations included site furnishings, specialty pavements, plantings, benches, lighting and crosswalks

PROJECTS / Planning

Lebanon Big 4 Trail Master Plan

Landstory partnered with an engineering consultant to prepare a schematic design for a segment of the 2/3-mile Big Four Trail in Lebanon, Indiana.  The schematic design included a proposed trail planning and alignment, trail vernacular including site furnishings, specialty pavements, plantings, benches, lighting and crosswalks.  Trail planning and design needs included determining trail access points, parking needs, connecting the trial to Lebanon destinations, right-of-way crossings, incorporating existing signage  and wayfinding, and considering future trail segments.  Stakeholder and public input were an important part of this project during the design process.